CLERYS DEPARTMENT STORE

Dublin

clerys-1

This substantial refurbishment was undertaken after the Clerys store was quite seriously damaged from water damage following a fault within the stores sprinkler system.

The requirement, therefore, was to complete this scheme within a very short period with the design and construction taking place over a 6 month period.

The CLERYS DEPARTMENT STORE project opened on time in November 2013 with the completed installation being highly sustainable being based entirely on the use of LED light sources.

Partners: McCarthy & Associates