Year: 2018

  • Johnson Building

    Johnson Building

    Project: Originally completed in 2005 and then partially refurbished in 2018, the Johnson Building established a new workplace look and feel with the use of exposed luminaires and solid soffit ceilings. Both projects were undertaken with the architects AHMM for Derwent London. The original work scope included all of the public areas of the building,…

  • Fora Borough

    Fora Borough

    Project: One of the earlier Fora co-working schemes, this project saw the development of the Fora offer to include a full on-site restaurant and a top floor Residents Lounge/Event space together with a large Resident Terrace. As well at the extensive support spaces, Borough provides high quality workspaces for the building Residents. A key element…

  • Aloft

    Aloft

    Project: Located in the ‘Liberties’ in the centre of Dublin, this hotel, which is a sister brand to the W hotels, provides a contemporary, technology-serviced location for the modern traveller. The striking Aloft brand is interpreted into a vibrant hotel interior which also references the hotels locality, a key part of the Aloft offer. EQ2’s…